Before buildings reach their final form, there is a different kind of architecture that allows them to come into being: scaffolding and construction work. While these usually disappear rather quickly, what would happen if the construction process itself became the architecture? This is the question behind Rubato, a temporary pavilion by Italian architectural collective HPO, installed in the outdoor square of Rome’s MAXXI as the winning project of the museum’s NXT 2026 programme.

The project’s title comes from music. In musical terminology, rubato describes a flexible interpretation of time, in which a performer subtly accelerates or slows down the rhythm to give a composition greater expressivity. HPO translates this principle into an architectural language: a composition of different elements, assembled according to a rhythm that is deliberately irregular.

The pavilion’s organisation

A 36-metre main beam runs along the diagonal of the square, establishing the primary axis of the intervention. Two other directions intersect it, one perpendicular to the museum’s pedestrian route, and another parallel to the large cantilevered gallery. Together, they create a loose grid that creates areas for sitting and gathering without a rigid pattern.

The structure accommodates several activities simultaneously, functioning as a public resting space, an outdoor venue for concerts, performances, talks, and screenings, with capacity for up to 200 people, and a site-specific sound installation. Speakers positioned within the gaps between the columns distribute a composition by Agnese Menguzzato.

Rubato © HPO
Rubato © HPO

The afterlife of building components

Rubato brings together elements recovered from different contexts, including construction, railway infrastructure, and the events industry. Its columns are made from precast concrete blocks from salvaged railway sleepers, while its horizontal structure uses aluminium trusses, and the shading system combines Innocenti tubes, steel cables, and welded mesh.

These components retain something of their original identities, and the resulting aesthetic is deliberately reminiscent of a building site. The approach resonates with the broader shift in architectural thinking towards circular construction and design for disassembly. Circular design advocates that buildings should be conceived as collections of components with different lifespans, capable of being repaired, replaced, and recovered independently.

Rubato by HPO © Giacomo Bianco
Rubato by HPO © Giacomo Bianco

Architecture as an ongoing process

Rather than treating sustainability as a question of substituting one material for another, the project approaches it as a matter of construction methods, material circulation, and the organisation of resources. The work also shows how temporary architecture can operate as a testing ground for these principles, a relatively limited intervention in which construction systems and alternative practices can be explored at full scale.

With Rubato, HPO proposes an architecture that is purposefully unfinished in its logic, and its value lies not only in what it provides during its installation at the MAXXI but also in the possibility of what comes afterwards. By treating architecture as an arrangement of reusable parts instead of an indivisible object, the project shifts attention from the finished building towards the relationships between materials and construction, time and use.

Useful links
Related profiles

HPO

Architect Italy
About the author

Anna Lazzaron

Anna Lazzaron is a designer, writer, and researcher based in Milan and Barcelona, working across material exploration and speculative practices.